AT2k Design BBS Message Area
Casually read the BBS message area using an easy to use interface. Messages are categorized exactly like they are on the BBS. You may post new messages or reply to existing messages! You are not logged in. Login here for full access privileges. |
Previous Message | Next Message | Back to Slashdot <-- <--- | Return to Home Page |
|
||||||
From | To | Subject | Date/Time | |||
![]() |
VRSS | All | 'Dragonfly' Mission to Saturn's Moon Titan: Behind Schedule, Ove |
September 13, 2025 9:00 PM |
||
Feed: Slashdot Feed Link: https://slashdot.org/ --- Title: 'Dragonfly' Mission to Saturn's Moon Titan: Behind Schedule, Overbudget, Says NASA Inspector General Link: https://science.slashdot.org/story/25/09/14/0... After its six-year journey to Saturn's moon Titan, Dragonfly's rotorcraft lander "will fly like a large drone," explains its web page, spending three years sampling multiple landing sites to characterize Titan's habitability and look for "precursors of the origin of life." "However, the project has undergone multiple replans impacting cost and schedule, resulting in a life- cycle cost increase of nearly $1 billion and over 2 years of delays," according to an announcement from NASA's Inspector General. From the Inspector General's report: The cost increase and schedule delay were largely the result of NASA directing [Johns Hopkins University] Applied Physics Laboratory to conduct four replans between June 2019 and July 2023 early in Dragonfly's development. Justifications for these replans included the COVID- 19 pandemic, supply chain issues, changes to accommodate a heavy-lift launch vehicle, projected funding challenges, and inflation." But its higher-than- expected life-cycle cost over $3 billion "will continue to absorb an increasing proportion of the Planetary Science Division's total budget," meaning Dragonfly's increased cost (and "additional budget constraints" |
||||||
|
Previous Message | Next Message | Back to Slashdot <-- <--- | Return to Home Page |
![]() Execution Time: 0.0141 seconds If you experience any problems with this website or need help, contact the webmaster. VADV-PHP Copyright © 2002-2025 Steve Winn, Aspect Technologies. All Rights Reserved. Virtual Advanced Copyright © 1995-1997 Roland De Graaf. |