AT2k Design BBS Message Area
Casually read the BBS message area using an easy to use interface. Messages are categorized exactly like they are on the BBS. You may post new messages or reply to existing messages! You are not logged in. Login here for full access privileges. |
Previous Message | Next Message | Back to Slashdot <-- <--- | Return to Home Page |
|
||||||
From | To | Subject | Date/Time | |||
![]() |
VRSS | All | Arizona Brings a Huge Grid Battery Online Ahead of Peak Demand |
July 8, 2025 5:20 AM |
||
Feed: Slashdot Feed Link: https://slashdot.org/ --- Title: Arizona Brings a Huge Grid Battery Online Ahead of Peak Demand Link: https://hardware.slashdot.org/story/25/07/08/... Arizona has activated one of its largest grid battery storage projects to help meet peak summer energy demand. Electrek reports: Recurrent Energy, a subsidiary of Canadian Solar, just brought its 1,200 MWh Papago Storage facility in Maricopa County into commercial operation. The big grid battery is now supplying stored electricity to Arizona Public Service (APS), the state's largest utility, in time for peak air-conditioning season. Papago is the first of three Recurrent projects with APS. Together, they'll provide 1,800 MWh of storage and 150 MW of solar power. That's enough to run about 72,000 homes for four hours and provide year-round solar for another 24,000 homes. Read more of this story at Slashdot. --- VRSS v2.1.180528 |
||||||
|
Previous Message | Next Message | Back to Slashdot <-- <--- | Return to Home Page |
![]() Execution Time: 0.0176 seconds If you experience any problems with this website or need help, contact the webmaster. VADV-PHP Copyright © 2002-2025 Steve Winn, Aspect Technologies. All Rights Reserved. Virtual Advanced Copyright © 1995-1997 Roland De Graaf. |